[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Hours, etc. @ Sodoi



I did happen to pass by Sodi this past Sunday evening.
At least per door/window signage, looks like they're back to their
"regular" (I presume academic term) hours:
Su 9a-5p
M-Sa 8a-5p

And, that last trace of sidewalk blockage, which didn't even
block access (was only on a narrow part of sidewalk not at all blocking
access/passage), is now also entirely gone and clear.

On Sat, Jan 11, 2025 at 7:47 AM Michael Paoli
<michael.paoli@berkeley.edu> wrote:
>
> I was by there yesterday, and where the sidewalk and fair bit of the
> street was blocked before,
> preventing pedestrian (and accessible) access between
> Channing side E of ramp & NW corner Channing & Telegraph
> that's no longer an issue for access/passage.  Only part of the sidewalk
> remains blocked, and not in a manner which prevents passage (there's
> clear access on sidewalk next to the buildings, only part of the
> sidewalk further out towards
> street is blocked).
>
> Might also be a good time for Sodoi.
> Notably UC Berkeley Academic calendar,
> Semester doesn't start until 2025-01-14,
> so probably not as busy/crowded (looked fairly quiet and
> not crowded at all when I went by there yesterday).
> I did also (yesterday) notice sign on Sodoi's current
> hours: 10am-4pm (2025-01-07--2025-01-17)
>
> On Wed, Jan 1, 2025 at 5:25 PM Michael Paoli <michael.paoli@berkeley.edu> wrote:
> >
> > Accessibility @ Sodoi - construction blocking sidewalk & part of
> > street between Channing side E of ramp & NW corner Channing &
> > Telegraph
> >
> > I noticed on 2024-12-27, by Sodoi Coffee Tasting House,
> > there's fair bit of construction blocking sidewalk and fair bit of
> > adjacent street,
> > between ramp (which itself is still clear and accessible) on Channing
> > Way and NW corner of Channing Way & Telegraph Ave.,
> > and also fair bit of Channing Way itself there (at least on the N side
> > of that street) - notably including the (yellow curb) loading zone
> > parking right next to the ramp.
> > So accessible access, remains from Channing Way side, but now start at
> > or S of the ramp until that construction on sidewalk is cleared.
> > From the looks of it, looks like semi-major construction (pretty torn
> > up there), so might be week(s) or more before it's clear again.
> > So, may or may not be cleared by the time of next regularly scheduled
> > meeting (2025-01-12).
> >
> > So in short, recommended access remains as before, except approach
> > that ramp from W of that ramp on Channing,
> > and the loading zone (yellow curb) parking next to that ramp is also
> > blocked by construction, but the ramp itself
> > remains open and accessible.

-- 
You received this message because you are subscribed to the Google Groups "BerkeleyLUG" group.
To unsubscribe from this group and stop receiving emails from it, send an email to berkeleylug+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/berkeleylug/CAPU_E%2BeeNCtwL%3DpDaZ7AYN9h%2B6LzhvHorQydm_MwQo0ndj8wjQ%40mail.gmail.com.